Perceive
Environment, assets and OT signal, time-stamped raw capture
Meters, control systems, finance, facilities, work orders and field capture, each time-stamped and attributed to its source system

VULCAN: the governed decision and action platform for facilities operations.
Start with the eight-gate diagnostic. Then perceive, interpret, model, decide, act and prove against one governed operating record. Designed for facilities operations; one operator portfolio engagement is measured below.
Your record. Your rights. Built to compound inside your walls. ↓
ESTABLISHEDSelected into Palantir Startup Fellowship Cohort 003.Read the announcement
one national operator, measured
Measured at one national operator across one operator portfolio. Reported as evidence from one engagement, not as a sector benchmark. No client is named.
01 / The thesis
One national operator's estate held several hundred datasets and more than twenty thousand columns. Fewer than half had a documented owner and defensible definition. The data was extensive. The meaning was missing.
Anyone can buy
Only you can accumulate
Operational platforms remain the systems of record. VULCAN is the operational ontology above them, holding every facility, asset, system, obligation, dollar and decision as governed objects the company and its AI can reason and act through.
The durable advantage is not the model. It is the permissioned record of what was observed, decided, executed, and what happened next.
Fig 08 · Intelligence flywheel
coded surface · illustrative
The intelligence flywheel
One segment cannot be bought

the thesis · at portfolio scale
Every figure on the surface resolves to the operating unit inside an asset someone is responsible for.
What has been observed, measured, or verified in the sector or in a stated engagement.
A design commitment this brief argues for. It constrains the build unless deliberately amended.
The marking stops an aspiration from being read as a commitment.
02 / The constant
Across every asset class, the platform is built around evidence rather than control.
Accountability holder
Owners and investors
Returns against what was underwritten, and the obligations that come with the capital.
System boundary
The third-party operator's PMS, CRM, finance and field systems.
Accountability holder
Asset managers
Business plan, CapEx, hold-or-sell, and the reporting behind each.
System boundary
The definitions the operating teams use to produce the numbers.
Accountability holder
Compliance and fund stakeholders
Contract compliance periods, covenant tests, audit evidence on demand.
System boundary
The systems where the underlying events are recorded.
Accountability holder
Government stakeholders
Standards and outcomes at installation facilities.
System boundary
The operating systems of the companies running the properties.
Accountable people need the source, permission, time and decision attached to each fact. The IT/OT seam connects business commitments to the equipment record.
The architecture is asset-class agnostic because the next estates are installations and utilities.
IT
Business systems · what was charged
OT
Equipment systems · what the meter recorded
The question that needs both
The meter recorded one number. The billing system charged another. Which one can the operator defend?
Illustrative of the surface, stated as a design principle. No delivered work is claimed.

the estate · one governed portfolio
Different assets carry different obligations. Accountability still lands with one operating team.
03 / The system
Environment, assets and OT signal, time-stamped raw capture
Meters, control systems, finance, facilities, work orders and field capture, each time-stamped and attributed to its source system
Raw signal becomes detections, states and anomalies
Consumption, exceptions, backlog, certification and service state, resolved against the operating calendar
Detections resolve against the mission ontology
Facility, asset, system, obligation, client, ownership entity, metric, decision and outcome as governed objects
Reasoning bounded by policy and evidence, producing a recommendation an operator can interrogate
A cited answer at the right level of detail, or an abstention where the evidence is thin
Approved actions route into systems of record with lineage
An assigned intervention with a named approver, written to the decision ledger with the outcome that followed
Conceptual illustration, not a customer ontology. Designed to link each recommendation to its source, approver and recorded outcome.
Design commitments, not a claim of deployed integrations. Environment, data location, model use, retention, export and writeback are confirmed in engagement terms.
governed answer
ledger row 2,431
The meter at Building 4 recorded 41,206 kWh in March. The billing system charged 44,910. The difference sits in three submeters never mapped to a suite.
Why
What travels with it
Authority · Definition · Confidence · Approval
Measured, inferred or forecast, never blurred together.
And a governed refusal
I cannot answer this at meter level. Two sources disagree on the circuit mapping and the conflict is unresolved; a stewardship exception is open and assigned. Here is what I can support: building-level consumption, reconciled as of yesterday.
VULCAN
Illustrative surface · not live client dataMission control · portfolio
Run
Designed to surface change, rank exceptions, assign owners and track the enterprise response, from portfolio down to one asset.
Executives · regionals · asset management · clients
Building 4 · west wing
Billback gap opened, 3 weeks
North plant
Shutdown slipping on 14 work orders
Tower 2
Certification close rate down
01 / 05 · scroll to move through the surface
What VULCAN is not
the operating floor · where the week is decided
The same record on every screen, so the meeting argues about the decision, not the numbers.
04 / The diagnostic
You cannot govern an estate you have not counted. The diagnostic is the first engagement and it is the same on every estate, because counting datasets, scoring authority and mapping boundaries does not depend on what the estate is.
Discovery standard / 08 gates
And do not accept it until
Every dataset enumerated with columns, row volume, owner and last refresh
Each dataset scored for authority; score, basis and reviewer recorded and reproducible
Recut datasets identified, the survivor named, lossy recuts flagged
Candidate keys profiled; collisions and drift documented, never corrected in silence
An explicit bridge between the analytics key and the system-of-record identifier; exceptions quarantined, not merged
Every dataset assigned a tier; those barred from broad pipelines listed explicitly
A deterministic include, defer or reject call per dataset, diffable between runs
Automated expectations that fail the build, not a report read afterwards
Operator portfolio is established; every other pairing is a PRINCIPLE design commitment, not a deployment claim or a capability shipping today.
The diagnostic establishes the unit first. It does not transplant operator portfolio measurements into another industry.
None of these operations depends on the industry. What changes is the unit of account and its obligation, established first.
Portability is a design principle, not evidence of deployment on every estate.
The same count runs on any estate. The question it answers differs by industry, and each sector page states its own.
05 / The scorecard
Before shipping, each capability names its target, owner, baseline, mechanism, and the measurement plan that will confirm or disprove the claim.
Fig 05 · Five-year compounding
coded surface · illustrative
Advantage over five operating years · illustrative
With a decision recordDashboards aloneIllustrative. The record accumulates only through operating; each year it survives, it is worth more and harder to reproduce.
the service outcome · measured at the facility
The scorecard protects the service delivered to the people using the facility while staffing, service and billing follow the requirement.
06 / The proof case
This is what the eight gates returned on one operator portfolio estate. The gates on yours are the same. The unit of account is what differs.
The measured output sits at the top of this page: several hundred datasets, twenty thousand columns, under half with a documented owner, three percent meeting the authority threshold. Your numbers will differ. The method will not: it has been run once at full scale, and nothing in it depends on the asset class.
Reported as evidence from one engagement, not as a sector benchmark. No client is named. None of these measurements transfers to another estate.
Fig 02 · Position map
coded surface · illustrative
Scroll to move through positions · positions are illustrative
Position
01 / 04
Condition sound · Obligation load easing
The estate is sound and the register is light. The job is to keep it that way on evidence.
Metric that decides it · Compliance exceptions
Condition sound · Obligation load easing
The estate is sound and the register is light. The job is to keep it that way on evidence.
Metric that decides it · Compliance exceptions
Condition sound · Obligation load mounting
The assets are sound but the obligations are stacking up. Clear the register before it becomes condition.
Metric that decides it · Backlog age
Condition deferred · Obligation load easing
Condition has been deferred and the bill is coming. Plan the capital before it plans you.
Metric that decides it · Deferred maintenance liability
Condition deferred · Obligation load mounting
Deferred condition under a mounting obligation load. Sequence the work or the sequence will be chosen for you.
Metric that decides it · Unplanned downtime
07 / At unit level
The operator portfolio estate resolves to the unit. The level differs by asset class; the discipline does not.
Office
01Operating cycle · Unit 0247 / Agreement · Rate · Counterparty · Changeover
The unit
The agreement, the rate, the counterparty and the changeover task all attach to the unit, inside an operating calendar.
Retail
02Twelve month cycle · Unit 308 / Agreement · Extension · Changeover
The unit
The agreement, the extension and the changeover all resolve to the unit, across an operating cycle.
Industrial and flex
03Scattered site plan / H 14
The facility
Scattered and horizontal stock makes the facility, not the site, the schedulable unit.
Mixed use
04Lease intelligence · Suite 4C / Clause 03 · Escalation
The suite and the lease clause
Recoveries, options and escalations live in clauses, not in a property average.
Medical office
05Certification record · Current / Scope · Period · Evidence · Program
The certified facility
Compliance attaches to the facility and its inspection period, not to the unit alone.
Data and life science
06Occupant service plan · Level 03 / Care · Staffing · Billing
The occupant and the service level
Service obligations and access requirements attach to the facility and its operating systems.
Discovery evidence belongs only to one operator portfolio, shown here under Office as a neutral label. It does not establish delivery in any commercial asset class. Other classes remain PRINCIPLE design commitments.
Site → building → unit → space
The obligation attaches here
Unit 402 · four spaces · one address
Unit level says
in service
Space level says
75% · one space exposed
Space A carries
What breaks above the unit of account
Availability and exposure
A part-failed system reads as available. Real exposure is understated in the weeks it matters most.
Cost allocation
Consumption and cost are set per meter and per suite. A building-level average hides which circuit is misbilled.
And the parties are not one party: the signer, the payer and the user are often three. Counterparty relationships are modeled explicitly and privacy-aware.
The managed and owned split is not a operator portfolio artifact. Any portfolio with third-party management and direct ownership carries both lenses over the same asset, and the two must never disagree.
year's end · the facility at dusk
Ninety days later, the same facility, with a record that can say what changed and why.
fit-out · where the obligation becomes work
The suite and its lease clauses define what is due, when it is due and who must authorize it.
08 / The operating year
Each was investigated from scratch, leaving no reusable record.
The doctrine transfers: one source per fact, one definition per metric, cited answers and recorded decisions. Models beyond one operator portfolio are designed, not yet proven in production.

Installation facilities. The same constant, the sharpest version. A path, not past performance.
A government stakeholder is accountable without running the operator's systems. Where a federal path is required, GSA MAS contract 47QRAA26D0058 is held by Element 29 LLC. No VULCAN deployment exists in that setting today; this is a path, not past performance.
whose record · the asset between windows
The building is theirs. So is the record of everything that happened inside it.
09 / The 90-day forge
Measured against a matched control, with the window and limits published beside the result.
Design commitments. Ownership, data location, retention, model use, approval and export are defined in engagement terms. The detailed authority is the Sovereignty page.
Review the seven layers and terms →11 / Appendix and start
Technical blueprint
The full technical blueprint is available under appropriate terms. It covers definitions, boundaries, delivery gates, source notes and the governed object model.
Start
We will scope the first governed decision with you: the question, the evidence it needs, the baseline, and how we will know it improved.
Built for platforms running 10k+ facilities or units · 2+ ownership models · 5+ systems in the decision path · 4+ transitions a year.